New! Cooling Towers Ops and Maintenance

Owner-Operators and Service Contractors
(Friday)
Start Date: January 26, 2018
Start Time: 7:30 am | End Time: 3:30 pm

Raising cooling system efficiencies is the goal. This redesigned workshop concentrates on overcoming the challenge! The cooling tower is so often the most neglected component in the chilled water operation.  We will cover cooling tower types, styles, configuration and installation, and the important connection between the cooling tower and the chiller condenser circuit.  We will briefly cover water treatment options required to help prolong the life of the tower.
WHAT YOU WILL LEARN
•Cooling tower operations and in-depth maintenance planning/performance.
• Installation process and importance of cooling tower locations.
•Concept of "free cooling," energy efficiencies and pump support importance.
•California codes and water treatment options.
•Procedures for tower blow down and bleed off.
•Cooling tower sumps, floats, sensors, pumps, fans, belts, motors, plenums, gear boxes, louvers, screens, heaters, VFDs, and vibration protection.

Attendee Info

Remove AttendeeAdd Another Attendee

Company Info

Billing Info

Apply Discount

Mail your check along with a copy of your class registration to:

Pacific Coast Trane Training Center
Attention: Fawn Davis
310 Soquel Way
Sunnyvale, CA 94085

/

Order Total: $275.00

Discount Amount: $


Cancellations for reimbursement must be made at least 5 business days prior to class. Credit can be given with 24 hour notice. No refund or credit for no-shows.
Questions?
Contact Fawn Davis at (408) 481.3655
Make checks payable to Pacific Coast Trane Training Center
Pacific Coast Trane
310 Soquel Ave.
Sunnyvale, CA 94089
Attention: Fawn Davis



We are not responsible for reprinting certificates of completion. All students are to handle their certificates with care and share with employers if required after finishing each training class.